Critical Raw Materials: What to Check Before Investing

Updated · Standard formula, shown below

Net present value 285 $M
Simple payback
6.2 years
Result
Project life
20 years
You entered
Initial capex
500 $M
You entered

Before investing in a critical raw materials project, companies should conduct a comprehensive due diligence covering geological confidence, technical feasibility, political and regulatory risk, environmental and social licensing, offtake agreements, and full life-cycle costs. This article explains the essential checks that separate viable projects from value traps.

Formula

The net present value (NPV) formula used above is:

NPV = -C₀ + (R – O) × [1 – (1 + r)^-n] / r

Where:

  • C₀ = initial capital expenditure (USD millions)
  • R = annual revenue (USD millions)
  • O = annual operating expenditure (USD millions)
  • r = discount rate (decimal, e.g., 8% = 0.08)
  • n = project life (years)

The simple payback period is:

Payback = C₀ / (R – O)

Worked Example

Using the default values from the calculator: initial capex = $500M, annual opex = $40M, annual revenue = $120M, discount rate = 8%, project life = 20 years.

  1. Annual net cash flow = $120M – $40M = $80M
  2. Annuity factor = [1 – (1.08)^-20] / 0.08 = [1 – 0.2145] / 0.08 = 0.7855 / 0.08 = 9.818
  3. PV of cash flows = $80M × 9.818 = $785.4M
  4. NPV = -$500M + $785.4M = $285.4M
  5. Simple payback = $500M / $80M = 6.25 years

The calculator shows NPV = $285M and payback = 6.3 years.

Geological and Technical Due Diligence

The first check is the quality of the mineral resource estimate. Companies should verify that the estimate follows internationally recognized reporting codes such as JORC or NI 43-101. Key factors include:

  • Ore grade and tonnage – higher grade usually means lower processing cost per unit of metal.
  • Mineralogy – some ores are refractory and require complex, costly extraction.
  • Metallurgical test work – must demonstrate that the proposed process actually recovers the metal at acceptable rates.
  • Mining method – open pit vs. underground affects capex, opex, and safety.
  • Infrastructure – access to power, water, roads, and ports.

A common mistake is relying on a single resource estimate. Independent audits and a second opinion from a reputable consulting firm are standard practice.

Political and Regulatory Risk

Critical raw materials are often located in countries with unstable governments or opaque legal systems. Companies should assess:

  • Mining code and permitting process – how long does it take to get a license?
  • Export restrictions – some countries impose quotas or taxes on raw ore to encourage domestic processing.
  • Contract stability – can the government change royalties or taxes retroactively?
  • Local content requirements – may force hiring and procurement from local suppliers.
  • Dispute resolution – is there an arbitration mechanism that is binding and enforceable?

Political risk insurance is available but adds cost. A thorough assessment should include scenario planning for regime change, nationalization, or civil unrest.

Environmental and Social License

Environmental impact assessments (EIA) are mandatory in most jurisdictions, but the quality varies. Investors should check:

  • Tailings management – the design of the tailings dam and its closure plan.
  • Water usage and discharge – especially in water-scarce regions.
  • Biodiversity offsets – are there protected species or habitats on site?
  • Community relations – have local communities given free, prior, and informed consent?
  • Resettlement plans – if people must be moved, are the plans fair and funded?

Social opposition can delay or kill a project. The 2013 Oyu Tolgoi expansion in Mongolia faced years of delays due to environmental and community disputes, despite having a signed investment agreement.

Market and Offtake Agreements

Critical raw materials often have volatile prices. Before investing, companies should secure offtake agreements – contracts that guarantee a buyer for the output. Key questions:

  • Who are the buyers? Are they creditworthy?
  • What is the pricing formula? Is it linked to a benchmark like the London Metal Exchange?
  • How long is the offtake term? Does it cover the payback period?
  • Are there penalties for non-delivery?
  • Is there a minimum take-or-pay volume?

For example, lithium projects often sign offtake deals with battery manufacturers or automakers. A project without an offtake is a speculation, not an investment.

Cost Estimation and Financial Modeling

Capital and operating cost estimates are often optimistic. Companies should compare the project’s costs against industry benchmarks and check:

  • Contingency – typically 15-25% for a feasibility study.
  • Escalation – are costs in real or nominal terms?
  • Exchange rate risk – if the project is in a different currency than the revenue.
  • Taxes and royalties – including local, regional, and national taxes.
  • Closure costs – the cost of decommissioning and rehabilitating the site.

The NPV calculator above uses a simple model. In practice, companies run Monte Carlo simulations to test how NPV changes with commodity price, grade, and cost variations.

Supply Chain and Downstream Integration

Critical raw materials are often used in specific industries. For example, rare earths are essential for magnets in wind turbines and EVs. Companies should assess:

  • Processing technology – is the ore processed on-site or sent to a third party?
  • Refining capacity – many critical minerals need specialized refining that is concentrated in a few countries.
  • Substitution risk – could a new technology replace this material?
  • Recycling potential – will recycled material flood the market and depress prices?

An often-overlooked check is the logistics of moving the concentrate. Some projects are in remote locations where the only way out is by truck on unpaved roads, which becomes expensive in the rainy season.

Frequently Asked Questions

What is a critical raw material?

Critical raw materials are substances that are economically important but have a high supply risk. The EU and the US publish lists that include rare earths, lithium, cobalt, and platinum group metals. The lists are updated periodically.

How long does due diligence take?

A full technical and legal due diligence can take 6 to 12 months for a large project. It involves site visits, data room review, and independent audits. Rushing this step is a common cause of failed investments.

What is the difference between a resource and a reserve?

A resource is a mineral occurrence that has been measured with some confidence but is not necessarily economically extractable. A reserve is a subset of the resource that has been demonstrated to be economically and legally feasible to extract. Reserves are what a bank will lend against.

How do I check if the project is environmentally sound?

Review the Environmental Impact Assessment (EIA) and look for third-party audits. Check if the company has a track record of environmental violations. Also, look at the tailings management plan – it should follow the Global Industry Standard on Tailings Management.

What are the main risks in critical mineral projects?

The main risks are commodity price volatility, geopolitical instability, technical failure, cost overruns, and regulatory changes. A diversified portfolio can mitigate some risks, but each project must stand on its own merits.

Can I use the NPV calculator for any mining project?

Yes, the calculator is a generic tool for any project with initial capital, annual operating costs, and revenue. However, it assumes constant cash flows and does not account for taxes, inflation, or price fluctuations. Use it for a rough estimate, not a final investment decision.

Related

Formula used
in t | Project life | years | 20 | 0
in cap | Initial capex | $M | 500 | 0
in opc | Annual opex | $M | 40 | 0
in rev | Annual revenue | $M | 120 | 0
in disc | Discount rate | % | 8 | 0
out npv | Net present value | $M | -cap + (rev-opc) * ((1-(1+disc/100)^-t)/(disc/100)) | 0
out payback | Simple payback | years | cap / (rev - opc) | 1

Each line is one input (in, sel, list) or one result (out: label, unit, formula, decimals). How the calculators work

Method: the standard formula for this calculation, rounded as each result states. See how the calculators work or report an error.