Kanban and Scrum are two distinct Agile frameworks, and a Kanban board is a visual tool used within Kanban—not a Scrum artifact. The short answer: a Kanban board is not Scrum, but both share Agile principles, and many teams combine them for a hybrid approach.
Formula
The calculator above is a placeholder for the actual topic—this is a tech comparison article, not a calculation. The formula section is not applicable here. Instead, focus on the conceptual formulas of Agile: Work In Progress (WIP) limits and cycle time.
What Is a Kanban Board?
A Kanban board is a visual workflow management tool that displays work items as cards moving through columns, typically “To Do,” “In Progress,” and “Done.” It originated from Toyota’s manufacturing system in the 1940s, where “kanban” means “signboard” in Japanese. The board helps teams see work at a glance, limit work in progress, and optimize flow.
Key elements of a Kanban board:
- Cards – each represents a work item (task, feature, or user story)
- Columns – stages of the workflow (e.g., Backlog, Analysis, Development, Testing, Deployed)
- WIP limits – a maximum number of cards allowed in a column at any time
- Swimlanes – horizontal rows to separate different work types or priorities
- Commitment point – where work is pulled into the system
What Is Scrum?
Scrum is a structured Agile framework for managing complex projects, primarily software development. It uses fixed-length iterations called sprints (usually 1–4 weeks), with defined roles (Product Owner, Scrum Master, Development Team), ceremonies (Sprint Planning, Daily Standup, Sprint Review, Sprint Retrospective), and artifacts (Product Backlog, Sprint Backlog, Increment).
Scrum’s key characteristics:
- Roles – three distinct accountabilities
- Sprints – time-boxed iterations that deliver a potentially releasable increment
- Ceremonies – regular events to inspect and adapt
- Backlog – a prioritized list of requirements
- Definition of Done – a shared understanding of what “complete” means
How They Relate to Agile
Agile is an umbrella term for a set of values and principles (from the Agile Manifesto, 2001) that prioritize individuals, interactions, working software, customer collaboration, and responding to change. Both Kanban and Scrum are Agile frameworks—they implement those values in different ways.
Scrum is prescriptive: it tells you roles, events, and artifacts. Kanban is more flexible: it only prescribes visualizing work, limiting WIP, and managing flow. You can use a Kanban board within a Scrum team (often called “Scrumban”) to visualize the sprint backlog and track progress.
Key Differences: Kanban vs Scrum
The main differences come down to structure and adaptability:
- Iterations – Scrum uses fixed sprints; Kanban uses continuous flow with no time-boxes
- Roles – Scrum mandates three roles; Kanban has no prescribed roles
- Changes – Scrum discourages changes mid-sprint; Kanban allows changes anytime as long as WIP limits are respected
- Prioritization – Scrum uses a Product Backlog with a single priority order; Kanban can have multiple priority lanes or classes of service
- Metrics – Scrum tracks velocity (work per sprint); Kanban tracks cycle time and throughput
- Board reset – Scrum boards are often reset each sprint; Kanban boards are persistent
When to Use Which
Choose Scrum when your work is complex, requires cross-functional collaboration, and can be planned in fixed increments. It works well for product development with a clear roadmap and a dedicated team.
Choose Kanban when work is unpredictable, arrives continuously (like support tickets or maintenance), or when you need to improve flow without changing roles. Kanban is also a good starting point for teams new to Agile because it’s less disruptive.
Many teams combine both in a “Scrumban” approach: keep the sprint rhythm and roles from Scrum, but use a Kanban board with WIP limits to manage flow within the sprint. This hybrid works well for teams that need both structure and flexibility.
Common Mistakes and Misconceptions
A frequent misconception is that a Kanban board is the same as Kanban. The board is just a tool; Kanban is a broader set of principles (visualize, limit WIP, manage flow, make policies explicit, improve collaboratively).
Another mistake is applying WIP limits without enforcing them. If a column has a limit of 3 but you allow 5 cards, the system doesn’t work—blocked items pile up and flow slows down.
Teams also confuse Scrum’s sprint board with a Kanban board. A Scrum board typically has columns like “To Do,” “In Progress,” “To Verify,” and “Done,” but it’s reset each sprint and doesn’t necessarily have WIP limits. A Kanban board is continuous and WIP-limited.
Finally, some think you must choose one or the other. In practice, many successful teams blend them. The goal is to improve delivery, not to follow a framework dogmatically.
How to Implement a Kanban Board (or Scrum Board)
Whether you adopt pure Kanban or use a board in Scrum, here are the steps to set one up:
- Map your workflow – list the stages from request to done (e.g., Backlog, Analysis, Development, Testing, Deployed).
- Create columns – each stage becomes a column on the board.
- Add cards – write each work item on a card with a short title and description.
- Set WIP limits – decide the maximum number of cards per column based on team capacity (start with 2–3 per person).
- Define policies – clarify what “done” means for each column (e.g., “Testing” requires automated tests passing).
- Pull work – team members pull cards from left to right, only when capacity allows.
- Review and improve – hold regular meetings to look at the board, identify bottlenecks, and adjust limits or columns.
Frequently Asked Questions
Is Kanban board part of Scrum?
No, a Kanban board is not a Scrum artifact. Scrum uses a Sprint Backlog and often a Scrum board, but you can use a Kanban board within Scrum to visualize the sprint work. The difference is that a Scrum board is reset each sprint, while a Kanban board is continuous.
Can you use Kanban without Agile?
Yes, Kanban originated in manufacturing (Toyota) before Agile existed. You can apply Kanban principles to any workflow, even non-software work. However, when people say “Kanban” in a software context, they usually mean Kanban as an Agile framework.
What is Scrumban?
Scrumban is a hybrid that combines Scrum’s roles and ceremonies with Kanban’s continuous flow and WIP limits. Teams use a Kanban board, hold daily standups, and plan in small batches rather than fixed sprints. It’s popular for support and maintenance teams that need both structure and flexibility.
Which is better: Kanban or Scrum?
Neither is universally better. Scrum provides more structure for complex product development with fixed deadlines. Kanban offers more flexibility for unpredictable, continuous work. The best choice depends on your team’s context, culture, and the nature of your work.
Do you need a physical board?
No, many teams use digital tools like Trello, Jira, or Azure Boards, but a physical whiteboard with sticky notes works just as well. The key is that the board is visible to the whole team and updated in real time.
How do WIP limits work?
WIP limits cap the number of cards in a column. For example, if “Development” has a limit of 3, only 3 cards can be in that column at once. When a card is finished, it moves to the next column, freeing space. This prevents overloading and reveals bottlenecks.
Related
Formula used
in t | Finish time | min | 50 | 0 in d | Distance | km | 10 | 0 out pace | Average pace | min/km | t / d | 2 out speed | Average speed | km/h | d / (t / 60) | 2
Each line is one input (in, sel, list) or one result (out: label, unit, formula, decimals). How the calculators work
Method: the standard formula for this calculation, rounded as each result states. See how the calculators work or report an error.