Concrete Yardage Formula:
From: | To: |
Concrete yardage calculation determines the volume of concrete needed for a project in cubic yards. It's essential for ordering the correct amount of concrete and avoiding costly over- or under-ordering.
The calculator uses the standard concrete yardage formula:
Where:
Explanation: The formula calculates volume in cubic feet and converts it to cubic yards by dividing by 27.
Details: Precise concrete calculations prevent material waste, ensure structural integrity, and help with accurate cost estimation for construction projects.
Tips: Measure all dimensions in feet. For irregular shapes, divide into rectangular sections and calculate separately. Always add 5-10% extra for spillage and variations.
Q1: How much extra concrete should I order?
A: Typically 5-10% extra to account for spillage, uneven subgrade, and variations in thickness.
Q2: How do I calculate for irregular shapes?
A: Divide the area into multiple rectangles, calculate each separately, then sum the totals.
Q3: What's the minimum depth for concrete slabs?
A: Residential slabs are typically 4 inches, driveways 5-6 inches, and heavy-use areas may need 6+ inches.
Q4: How do I convert inches to feet for depth?
A: Divide inches by 12 (e.g., 4 inches = 0.33 feet).
Q5: How many bags of concrete mix equal a yard?
A: One cubic yard equals about 45 80-lb bags or 60 60-lb bags of concrete mix.