Stone Calculation Formula:
From: | To: |
The stone calculation determines the amount of stone (in tons) needed for a project based on the area to be covered, the desired depth of the stone layer, and the density of the stone material.
The calculator uses the stone calculation formula:
Where:
Explanation: The formula first calculates the volume in cubic yards, then multiplies by the stone density to get the weight in tons.
Details: Accurate stone calculation is crucial for project planning, budgeting, and ensuring you have enough material without excessive waste.
Tips: Enter area in square feet, depth in feet, and stone density in tons per cubic yard. Common densities: crushed stone ~1.25 tons/yd³, gravel ~1.4 tons/yd³.
Q1: Why divide by 27 in the formula?
A: There are 27 cubic feet in 1 cubic yard, so we divide by 27 to convert from cubic feet to cubic yards.
Q2: How do I measure the area?
A: For rectangular areas: length × width. For circular areas: π × radius². For irregular shapes, break into smaller regular shapes.
Q3: What's a typical depth for stone projects?
A: For walkways: 2-4 inches (0.17-0.33 ft), driveways: 4-6 inches (0.33-0.5 ft), drainage: 6-12 inches (0.5-1 ft).
Q4: How do I find my stone's density?
A: Check with your supplier. Common range is 1.2-1.6 tons per cubic yard depending on stone type and size.
Q5: Should I order extra stone?
A: It's recommended to order 10-15% more than calculated to account for compaction, spillage, and uneven surfaces.