Black Iron Beast 5/3/1 Method:
From: | To: |
The 5/3/1 program is a strength training protocol developed by Jim Wendler. It's based on cycles of four weeks with different rep schemes each week, working up to a top set. The program emphasizes gradual progression and sustainable strength gains.
The calculator uses your training max (90% of your 1RM) to calculate the appropriate weights for each week of the 5/3/1 cycle:
The "+" indicates you should do as many reps as possible with good form on the final set.
Details: The training max is 90% of your actual 1-rep max. This conservative approach allows for consistent progress while minimizing injury risk and accommodating bad days.
Tips: Enter your training max for each lift in kg. The calculator will generate the exact weights to use for each week of the 4-week cycle.
Q1: How often should I increase my training max?
A: Typically after each 4-week cycle, increase by 2.5kg for upper body lifts and 5kg for lower body lifts.
Q2: What assistance work should I do?
A: Wendler recommends 50-100 reps of push, pull, and single-leg/core exercises after the main work.
Q3: Can I customize the program?
A: Yes, there are many variations (BBB, Boring But Strong, etc.), but master the basic template first.